{"id":595,"date":"2021-02-15T19:45:20","date_gmt":"2021-02-15T19:45:20","guid":{"rendered":"http:\/\/www.metromech.com\/blog\/?p=595"},"modified":"2021-02-09T20:09:08","modified_gmt":"2021-02-09T20:09:08","slug":"unoccupied-office-building-water-leak","status":"publish","type":"post","link":"https:\/\/www.metromech.com\/blog\/2021\/02\/unoccupied-office-building-water-leak\/","title":{"rendered":"LESSONS LEARNED: Unoccupied Office Building Water Leak"},"content":{"rendered":"<h3><strong>Minimize Damage with Preventative Maintenance Services<\/strong><\/h3>\n<p>Our Service division was recently called to a customer\u2019s office building after someone discovered severe water damage. Upon inspection, our team discovered that a pipe on the 5<sup>th<\/sup> floor of the office building had burst and leaked water all the way to the 1<sup>st<\/sup> floor resulting in over $100K in damage. The water had been running for at least two days before anyone discovered it.<\/p>\n<p><a href=\"http:\/\/www.metromech.com\/blog\/wp-content\/uploads\/2021\/02\/Picture1.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"225\" height=\"300\" class=\"alignnone size-medium wp-image-596\" src=\"http:\/\/www.metromech.com\/blog\/wp-content\/uploads\/2021\/02\/Picture1-225x300.jpg\" alt=\"water leak office building\" srcset=\"https:\/\/www.metromech.com\/blog\/wp-content\/uploads\/2021\/02\/Picture1-225x300.jpg 225w, https:\/\/www.metromech.com\/blog\/wp-content\/uploads\/2021\/02\/Picture1.jpg 412w\" sizes=\"auto, (max-width: 225px) 100vw, 225px\" \/><\/a><a href=\"http:\/\/www.metromech.com\/blog\/wp-content\/uploads\/2021\/02\/Picture2.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-597\" src=\"http:\/\/www.metromech.com\/blog\/wp-content\/uploads\/2021\/02\/Picture2.jpg\" alt=\"water leak unoccupied building\" width=\"398\" height=\"298\" \/><\/a><\/p>\n<h3><strong>THE CAUSE<\/strong><\/h3>\n<p>Because of the pandemic, this office, like many others has been largely unoccupied with employees working from home. As a result, the water in the pipe hadn\u2019t been flowing for almost a year. As the temperatures decreased, the stagnant water froze and broke the pipe. With no one to monitor the facility, the water was able to do damage for multiple days.<\/p>\n<h3><strong>THE SOLUTION<\/strong><\/h3>\n<p>This costly damage could have been minimized or avoided altogether with daily walk throughs and ongoing preventative HVAC maintenance. Partnering with an experienced service contractor who can monitor and maintain your building\u2019s systems will protect your facility and ensure your HVAC system will be ready to go when employees return to the office. All faucets and fixtures should be used at least weekly, toilets should be flushed once a week. Daily walk throughs to check all systems is the best way to reduce your risk of damage and system failure.<\/p>\n<h3><strong>HVAC &amp; Mechanical System Maintenance<\/strong><\/h3>\n<p>If your building is currently unoccupied, you should make sure that your building\u2019s systems are still being taken care of. Your heating, cooling and plumbing systems need regular check-ups to keep your systems functional and prevent expensive repairs and building damage. At MMC, our Service Division can create a preventative maintenance plan that is customized to your needs. In addition, we offer 24-7 emergency service to customers in the Twin Cities, St. Cloud, MN and Fargo, ND. <a href=\"https:\/\/www.metromech.com\/contact-us.php\">Contact MMC<\/a> to learn more about our mechanical services.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Minimize Damage with Preventative Maintenance Services Our Service division was recently called to a customer\u2019s office building after someone discovered severe water damage. Upon inspection, our team discovered that a pipe on the 5th floor of the office building had&hellip; <a href=\"https:\/\/www.metromech.com\/blog\/2021\/02\/unoccupied-office-building-water-leak\/\" class=\"more-link\">Continue Reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":3,"featured_media":596,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[9],"tags":[],"class_list":["post-595","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-service"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Empty Building Water Leak \u2502 Metropolitan Mechanical Contractors<\/title>\n<meta name=\"description\" content=\"A customer\u2019s unoccupied building had a water leak that could have been prevented through proper maintenance. Read to learn more!\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.metromech.com\/blog\/2021\/02\/unoccupied-office-building-water-leak\/\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"jheltunen\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.metromech.com\\\/blog\\\/2021\\\/02\\\/unoccupied-office-building-water-leak\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.metromech.com\\\/blog\\\/2021\\\/02\\\/unoccupied-office-building-water-leak\\\/\"},\"author\":{\"name\":\"jheltunen\",\"@id\":\"https:\\\/\\\/www.metromech.com\\\/blog\\\/#\\\/schema\\\/person\\\/dac215008a7a291e3379ec441802226c\"},\"headline\":\"LESSONS LEARNED: Unoccupied Office Building Water Leak\",\"datePublished\":\"2021-02-15T19:45:20+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.metromech.com\\\/blog\\\/2021\\\/02\\\/unoccupied-office-building-water-leak\\\/\"},\"wordCount\":329,\"image\":{\"@id\":\"https:\\\/\\\/www.metromech.com\\\/blog\\\/2021\\\/02\\\/unoccupied-office-building-water-leak\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.metromech.com\\\/blog\\\/wp-content\\\/uploads\\\/2021\\\/02\\\/Picture1.jpg\",\"articleSection\":[\"Service\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.metromech.com\\\/blog\\\/2021\\\/02\\\/unoccupied-office-building-water-leak\\\/\",\"url\":\"https:\\\/\\\/www.metromech.com\\\/blog\\\/2021\\\/02\\\/unoccupied-office-building-water-leak\\\/\",\"name\":\"Empty Building Water Leak \u2502 Metropolitan Mechanical Contractors\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.metromech.com\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.metromech.com\\\/blog\\\/2021\\\/02\\\/unoccupied-office-building-water-leak\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.metromech.com\\\/blog\\\/2021\\\/02\\\/unoccupied-office-building-water-leak\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.metromech.com\\\/blog\\\/wp-content\\\/uploads\\\/2021\\\/02\\\/Picture1.jpg\",\"datePublished\":\"2021-02-15T19:45:20+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.metromech.com\\\/blog\\\/#\\\/schema\\\/person\\\/dac215008a7a291e3379ec441802226c\"},\"description\":\"A customer\u2019s unoccupied building had a water leak that could have been prevented through proper maintenance. Read to learn more!\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.metromech.com\\\/blog\\\/2021\\\/02\\\/unoccupied-office-building-water-leak\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.metromech.com\\\/blog\\\/2021\\\/02\\\/unoccupied-office-building-water-leak\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.metromech.com\\\/blog\\\/2021\\\/02\\\/unoccupied-office-building-water-leak\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.metromech.com\\\/blog\\\/wp-content\\\/uploads\\\/2021\\\/02\\\/Picture1.jpg\",\"contentUrl\":\"https:\\\/\\\/www.metromech.com\\\/blog\\\/wp-content\\\/uploads\\\/2021\\\/02\\\/Picture1.jpg\",\"width\":412,\"height\":549,\"caption\":\"water leak office building\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.metromech.com\\\/blog\\\/2021\\\/02\\\/unoccupied-office-building-water-leak\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.metromech.com\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"LESSONS LEARNED: Unoccupied Office Building Water Leak\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.metromech.com\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/www.metromech.com\\\/blog\\\/\",\"name\":\"Mechanical Services Blog\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.metromech.com\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.metromech.com\\\/blog\\\/#\\\/schema\\\/person\\\/dac215008a7a291e3379ec441802226c\",\"name\":\"jheltunen\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6f93f7901e679dc73c0ebc994ad2dc26f932dbddc508ded57ad48bf938dc4e1a?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6f93f7901e679dc73c0ebc994ad2dc26f932dbddc508ded57ad48bf938dc4e1a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6f93f7901e679dc73c0ebc994ad2dc26f932dbddc508ded57ad48bf938dc4e1a?s=96&d=mm&r=g\",\"caption\":\"jheltunen\"},\"url\":\"https:\\\/\\\/www.metromech.com\\\/blog\\\/author\\\/jheltunen\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Empty Building Water Leak \u2502 Metropolitan Mechanical Contractors","description":"A customer\u2019s unoccupied building had a water leak that could have been prevented through proper maintenance. Read to learn more!","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.metromech.com\/blog\/2021\/02\/unoccupied-office-building-water-leak\/","twitter_misc":{"Written by":"jheltunen","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.metromech.com\/blog\/2021\/02\/unoccupied-office-building-water-leak\/#article","isPartOf":{"@id":"https:\/\/www.metromech.com\/blog\/2021\/02\/unoccupied-office-building-water-leak\/"},"author":{"name":"jheltunen","@id":"https:\/\/www.metromech.com\/blog\/#\/schema\/person\/dac215008a7a291e3379ec441802226c"},"headline":"LESSONS LEARNED: Unoccupied Office Building Water Leak","datePublished":"2021-02-15T19:45:20+00:00","mainEntityOfPage":{"@id":"https:\/\/www.metromech.com\/blog\/2021\/02\/unoccupied-office-building-water-leak\/"},"wordCount":329,"image":{"@id":"https:\/\/www.metromech.com\/blog\/2021\/02\/unoccupied-office-building-water-leak\/#primaryimage"},"thumbnailUrl":"https:\/\/www.metromech.com\/blog\/wp-content\/uploads\/2021\/02\/Picture1.jpg","articleSection":["Service"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.metromech.com\/blog\/2021\/02\/unoccupied-office-building-water-leak\/","url":"https:\/\/www.metromech.com\/blog\/2021\/02\/unoccupied-office-building-water-leak\/","name":"Empty Building Water Leak \u2502 Metropolitan Mechanical Contractors","isPartOf":{"@id":"https:\/\/www.metromech.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.metromech.com\/blog\/2021\/02\/unoccupied-office-building-water-leak\/#primaryimage"},"image":{"@id":"https:\/\/www.metromech.com\/blog\/2021\/02\/unoccupied-office-building-water-leak\/#primaryimage"},"thumbnailUrl":"https:\/\/www.metromech.com\/blog\/wp-content\/uploads\/2021\/02\/Picture1.jpg","datePublished":"2021-02-15T19:45:20+00:00","author":{"@id":"https:\/\/www.metromech.com\/blog\/#\/schema\/person\/dac215008a7a291e3379ec441802226c"},"description":"A customer\u2019s unoccupied building had a water leak that could have been prevented through proper maintenance. Read to learn more!","breadcrumb":{"@id":"https:\/\/www.metromech.com\/blog\/2021\/02\/unoccupied-office-building-water-leak\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.metromech.com\/blog\/2021\/02\/unoccupied-office-building-water-leak\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.metromech.com\/blog\/2021\/02\/unoccupied-office-building-water-leak\/#primaryimage","url":"https:\/\/www.metromech.com\/blog\/wp-content\/uploads\/2021\/02\/Picture1.jpg","contentUrl":"https:\/\/www.metromech.com\/blog\/wp-content\/uploads\/2021\/02\/Picture1.jpg","width":412,"height":549,"caption":"water leak office building"},{"@type":"BreadcrumbList","@id":"https:\/\/www.metromech.com\/blog\/2021\/02\/unoccupied-office-building-water-leak\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.metromech.com\/blog\/"},{"@type":"ListItem","position":2,"name":"LESSONS LEARNED: Unoccupied Office Building Water Leak"}]},{"@type":"WebSite","@id":"https:\/\/www.metromech.com\/blog\/#website","url":"https:\/\/www.metromech.com\/blog\/","name":"Mechanical Services Blog","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.metromech.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.metromech.com\/blog\/#\/schema\/person\/dac215008a7a291e3379ec441802226c","name":"jheltunen","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/6f93f7901e679dc73c0ebc994ad2dc26f932dbddc508ded57ad48bf938dc4e1a?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/6f93f7901e679dc73c0ebc994ad2dc26f932dbddc508ded57ad48bf938dc4e1a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/6f93f7901e679dc73c0ebc994ad2dc26f932dbddc508ded57ad48bf938dc4e1a?s=96&d=mm&r=g","caption":"jheltunen"},"url":"https:\/\/www.metromech.com\/blog\/author\/jheltunen\/"}]}},"_links":{"self":[{"href":"https:\/\/www.metromech.com\/blog\/wp-json\/wp\/v2\/posts\/595","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.metromech.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.metromech.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.metromech.com\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.metromech.com\/blog\/wp-json\/wp\/v2\/comments?post=595"}],"version-history":[{"count":4,"href":"https:\/\/www.metromech.com\/blog\/wp-json\/wp\/v2\/posts\/595\/revisions"}],"predecessor-version":[{"id":603,"href":"https:\/\/www.metromech.com\/blog\/wp-json\/wp\/v2\/posts\/595\/revisions\/603"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.metromech.com\/blog\/wp-json\/wp\/v2\/media\/596"}],"wp:attachment":[{"href":"https:\/\/www.metromech.com\/blog\/wp-json\/wp\/v2\/media?parent=595"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.metromech.com\/blog\/wp-json\/wp\/v2\/categories?post=595"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.metromech.com\/blog\/wp-json\/wp\/v2\/tags?post=595"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}